Applies To Product(s): ProjectWise and Project Administrator Version(s): 08.11.09.140 Environment: N/A Area: N/A Subarea: N/A Original Author: Bentley Technical Support Group Overview Sometimes during ProjectWise Integration with Project Administrator the dialog that is used for the integration will be greyed out as shown below: Cause/Solution: 1. Check the install order of the Bentley Applications. ProjectWise must be installed before any AutoPLANT applications. This will allow AutoPLANT upon installation to make the correct ProjectWise connections. 2. Make sure the C:\Program Files (x86)\Bentley\ProjectWise\Bin\Pwintutilsv8i.dll exist. 3. The project must be a Central Mode Project. Distributed Mode Projects will not sync with ProjectWise.
↧