OpenPlant places the gaskets and bolts from the spec/lineNumber that it is currently selected when the flange to flange connection is made. So currently the bolts and gaskets are placed on the new spec/lineNumber and not the previous spec/lineNumber. If the bolts and gaskets need to be put on the first spec/lineNumber then the spec/lineNumber will need to be changed back to its original setting then the first flange would need to be deleted and replaced thus pulling the bolts and gaskets from the original spec and placing it on the original lineNumber. Other users have encountered this issue and a change request has been made to do the following: Allow the user to set the behavior between having the bolts and gaskets use the existing flange spec/lineNumber or new spec/lineNumber. Allow Pipeline manager to reassign the spec/lineNumber of bolts and gaskets.
↧