Hi,
I'm trying to add revision to existing drawing using Revise Document Button in Layout Manager. But when I try to add a second revision (like rev.2), the second revision is now on order 1 and the previous is on order 2. The first revision should stay on order 1 and second revision should be on order 2. The drawings generated from this are not correct, because we want revision 1 to stay at the same place as before.
I'm using I & W version 08.11.09.140.
Thanks,
Eric