Is there way to change the rating when placing a pipe with the intelligent line manager? For example with placing a Spears pipe with an "IL" the default schedule is set to 14. In the same way you can select a specification before populating a pipe run. Can you also select the schedule of pipe? Under Design Values the "rating" does not allow for any picks.
↧