I was wondering if anybody has figured out an elegant workflow solutions for Process Flow Diagram (PFD) and Piping Instrumentation Diagrams (PID) in a single project environment.
If you draw the PFD the system forces numbering from the start, but the pump you draw in the PFD also exist in the P&ID and having the duplication checking switched off is not an option for us.
Anybody solved this…?
Regards
Spyker